The project was a re-build of an existing school from the 1950's. Jonathan Toner's Alma Mater was Lynch so it was an exciting honor for him to be on the project. Terra Tectonics designed the hardscape plan for the site. Featuring the courtyard with a butterfly garden as a welcoming and greeting area for teachers parents and students. We installed a large gathering tree at one end to be used as a signature gathering area. The trees were chosen to flower during the school year. The site was planted with Florida Friendly native plantings with a Terra Tectonics designed efficient irrigation system, including a weather station controller to maximize watering efficiency.
Terra Tectonics design group, Inc.
1188 Kapp Drive, Clearwater, Florida 33765, United States